Trunk Road T2 and Cha Kwo Ling Tunnel

Back Trunk Road T2 and Cha Kwo Ling Tunnel Trunk Road T2 and Cha Kwo Ling Tunnel project (T2 project) is a 3.4km long dual two-lane trunk road together with two ventilation buildings. Once completed, it will be part of the strategic road network, providing an east-west express link between West Kowloon and Tseung Kwan […]
Tuen Mun-Chek Lap Kok Link Northern Connection Sub-sea Tunnel Section

Back Tuen Mun-Chek Lap Kok Link Northern Connection Sub-sea Tunnel Section The Tuen Mun-Chek Lap Kok Link provides a strategic link connecting the Northwest New Territories to North Lantau, the Hong Kong International Airport and the Hong Kong-Zhuhai-Macao Bridge Hong Kong Port. The 9km long link road is divided by the HZMB Hong Kong Port […]
Liantang/Heung Yuen Wai Boundary Control Point

Back Liantang/Heung Yuen Wai Boundary Control Point BYME was commissioned to provide E&M Works for 2 sections of dual-tube two-lane Tunnels – Cheung Shan Tunnel & Lung Shan Tunnel, 56 nos. of Cross Passage areas & Building Services Systems for 6 auxiliary Buildings. Client Civil Engineering and Development Department Project period Dec 2013 – Jun […]
Hong Kong-Zhuhai-Macao Bridge – Hong Kong Link Road

Back Hong Kong-Zhuhai-Macao Bridge – Hong Kong Link Road Spanning over 50 km, Hong Kong-Zhuhai-Macao Bridge is set to be the key improvement to the socio-economic aspects of the region. BYME’s scope of works in this challenging project include the supply and installation of HV distribution system from Scenic Hill Tunnel Ventilation Building to provide […]
CLP Castle Peak Cable Tunnel

Back CLP – Castle Peak Cable Tunnel The CLP Castle Peak Cable Tunnel is designed to bring the essential additional power supplies from the Castle Peak and Black Point Power Stations to the growing urban areas of Tuen Mun and the Chek Lap Kok. The 4.5 km long tunnel allows for the installation of eight […]
East Tsing Yi Viaduct

Back East Tsing Yi Viaduct The East Tsing Yi Viaduct connects the Stonecutters Bridge and Nam Wan Tunnel. This viaduct, which is a dual three-lane viaduct, forms part of the 7.6 km long Route 8 that links Lantau Island, Tsing Yi Island, Cheung Sha Wan Island, and Sha Tin. Within the scope of the contract, […]
CLP Cable Tunnels and Crossing

Back CLP Cable Tunnels & Crossing To expand its presense in Hong Kong, CLP Power Hong Kong constructed cable tunnels linking various regions in Hong Kong. There are four tunnel locations included within the scope of this project: Kwai Chung, Tsz Wan Shan, Tuen Mun, and Chi Ma Wan. BYME was tasked to provide the […]
KCRC – Tai Lam Tunnel

Back KCRC Tai Lam Tunnel This tunnel was constructed in a bid to alleviate traffic congestion at Tuen Mun Road, Tate’s Cairn Tunnel, and Castle Peak Road, and to connect New Territories West to urban areas of Kowloon West and Hong Kong Island. BYME was then appointed to provide the complete E&M installation for this […]